
Project Overview
With the expansion of medical services, Changzhou Maternal and Child Health Hospital launched an expansion project in September 2023, which will generate a large amount of medical wastewater daily. To ensure the safety of the surrounding environment, all medical wastewater must undergo strict treatment before being discharged, and the treated water quality must meet the pre-treatment requirements in the "Discharge Standards for Water Pollutants in Medical Institutions" GB18466-2005. The designed drainage capacity is 100 tons/day. To ensure timely delivery of the project and meet the discharge standards, Linglan Environment is responsible for supplying and installing the sewage treatment system.
Technical solution
Linglan Environment provided one ISES Mega type sewage treatment equipment for the project, which adopts advanced physicochemical, sedimentation, and disinfection processes. The specific processing procedure is as follows:
1. Physical and chemical treatment: By adding chemical agents, suspended solids and some organic pollutants in the wastewater are removed, causing the pollutant particles in the wastewater to aggregate and form flocs that are easy to precipitate.
2. Precipitation: By gravity settling, solid particles in wastewater are further separated to reduce suspended solids content.
3. Disinfection: Efficient disinfection techniques are used to ensure that harmful substances such as pathogenic microorganisms and viruses in wastewater are thoroughly eliminated, meeting safe discharge standards.
The design of this sewage treatment system not only ensures treatment efficiency, but also has advantages such as stable operation and easy operation, which is suitable for the daily sewage treatment needs of medical institutions.
project implementation
Linglan Environment began providing sewage treatment equipment for the project in July 2024 and successfully completed the installation and commissioning of the equipment in August 2024. After the equipment was put into use, it operated stably and effectively ensured that the medical wastewater generated during the expansion process of Changzhou Maternal and Child Health Hospital could be safely discharged in compliance with standards.
Project achievements
1. effluent quality: After treatment, all indicators of medical wastewater meet the pre-treatment standards in the "Discharge Standards for Water Pollutants in Medical Institutions" GB18466-2005.
2. Operation effect: The ISES Mega sewage treatment equipment operates reliably and has superior treatment effect, meeting the high standard requirements of hospital sewage treatment.
3. Customer feedback: Changzhou Maternity and Child Health Hospital highly recognizes the treatment effect and operational stability of the equipment, especially the characteristics of easy operation and low maintenance costs, which greatly improve the efficiency and safety of the hospital's sewage treatment.
summary
The successful implementation of this project has provided strong sewage treatment support for the expansion project of Changzhou Maternal and Child Health Hospital, effectively reducing the impact of medical wastewater on the surrounding environment. Linglan Environment, with its professional technical solutions and efficient equipment guarantee, ensures the safe treatment and standard discharge of hospital sewage, and also provides valuable experience for sewage management in medical institutions.


